112745 - IPD Performance Intercooler P80 850 C70 S70 V70

$795.00PER EACH| IPD ITEM NUMBER | 112745 |
| CLASSIFICATION | PERFORMANCE PARTS |
| QUALITY LEVEL | BEST (BETTER THAN OE) |
| BRAND | IPD |
| MATERIAL | ALUMINUM |
| UNITS PER CAR | 1 |
| WARRANTY | ONE YEAR PARTS WARRANTY |
| SPECIFICATIONS | 75MM CORE THICKNESS |
| CROSS REFERENCE | 870IC |
Product Description
ipd's performance intercooler has a 30% larger core, all aluminum construction and is a direct bolt in -- compatible with both factory or aftermarket RIP kit intercooler piping.
Featuring Hi flow & hi efficiency bar and plate core construction, the intercooler makes an excellent addition to Stage III cars and cars running larger turbos. The stock intercooler does a great job with the stock turbo, but as soon as you upgrade the turbo, you can easily exceed the heat shedding capabilities of the stock unit under high load runs, which can lead to a loss of up to 12 HP.
Disclaimer: Performance products sold by IPD have not been tested or approved by any international, federal or local governing agency for street use, thus are designated for non-road or race track use only. Although every effort is made to maintain or improve upon the emissions standards and safety of your Volvo, some of our products may not be legal for street use in your region. IPD makes no claim of fitness or certification for such use and leave it up to you to research the laws of your region.
Product Status & Availability
Adding items to your shopping cart and placing an order is only an intent to purchase. We will not charge you for anything until we can ship the products you ordered. We will do everything we can to fill your order in a timely manner. You can cancel your order at any time prior to shipment.
This stocked product is available to order plus backorders are allowed.
This item is an assembled kit. It consists of multiple component items or processes that are pre-kitted or assembled by our employees and becomes a single product. In some cases, this kit could have multiple stages or processes such as machine work, powder coating or laser marking which can sometimes cause unpredictable delays in availability.
| Units in warehouse: | 2 |
| Units available to ship: | 2 |













